Analog Devices |
![]() |
| Contract Value: $1.5M |
| Trades: HVAC, Plumbing |
| Owner: Analog Devices |
| Architect: Symmes, Maini, & McKee Associates |
| General Contractor: Connolly Brothers, Inc. |
| This large manufacturing facility required complete renovation of its HVAC infrastructure. The renovation process included design and installation of pre-fabricated piping as well as two (2) 500-ton chillers, three (3) steam boilers totaling 3300 MVH, 10-inch chilled water lines, and a 14” steam header. |