Children’s Hospital – Clinical Expansion |
![]() |
| Contract Value: $7.9M |
| Trades: Plumbing, Fire Protection |
| Owner: Children’s Hospital Medical Center Corp. |
| Architect: Shepley Bulfinch Richardson and Abbott |
| General Contractor: N/A |
Complete plumbing and fire protection systems were designed and installed for this expansion project at the existing children’s hospital. The mechanical infrastructure for these clinical facilities included a domestic booster pump, sewage injections, emergency storm pumps, a steam-fired hot water system, and medical vacuum pumps. Medical air pumps, a gas evacuation system, and a laser smoke evacuation system were also installed, as well as CO2 and N2O manifolds. |

